Quanzhou Ridge Steel Structure Co.,Ltd.
Products
Products
Home > Products > Steel Structure Shed > Canada Field Project Customized Prefabricated Steel Structure Warehouse and Integrated Office for Light Industrial Plants

Canada Field Project Customized Prefabricated Steel Structure Warehouse and Integrated Office for Light Industrial Plants

Product Details

Place of Origin: FUJIAN,CHINA

Brand Name: QZ RIDGE

Certification: CE,SGS

Model Number: RS-11061421

Payment & Shipping Terms

Minimum Order Quantity: 250 square meters

Price: USD 55~68 square meters

Packaging Details: naked

Delivery Time: 45days

Payment Terms: L/C,T/T

Supply Ability: 20000 square meters per month

Get Best Price
Highlight:
Product Name:
Steel Structure Building
Roof & Wall Panel:
Material Steel Sheet Or Sandwich Panel
Advantage:
Quick Installation;Design Flexibility;Durability ;Cost Efficiency
Processing Service:
Bending, Welding, Cutting, Punching
Application:
Steel Workshop, Garage Shed, Buildings Prefab Workshop, Steel Warehouse, Warehouse, Workshop
Main Frame:
Solid H-shape Steel Beam
Surface Treatment:
Hot Dip Galvanised & Painted
Product Name:
Steel Structure Building
Roof & Wall Panel:
Material Steel Sheet Or Sandwich Panel
Advantage:
Quick Installation;Design Flexibility;Durability ;Cost Efficiency
Processing Service:
Bending, Welding, Cutting, Punching
Application:
Steel Workshop, Garage Shed, Buildings Prefab Workshop, Steel Warehouse, Warehouse, Workshop
Main Frame:
Solid H-shape Steel Beam
Surface Treatment:
Hot Dip Galvanised & Painted
Canada Field Project Customized Prefabricated Steel Structure Warehouse and Integrated Office for Light Industrial Plants


What Is a Prefabricated Steel Structure Building?

A prefabricated steel structure building is a bolt-together steel frame system in which every column, rafter, purlin, and connection plate is precision-cut, drilled, and welded in our factory — then containerized and shipped to your site for rapid assembly.

Unlike traditional on-site steel fabrication (which is slow, weather-dependent, and expensive in most countries), our approach delivers:

· 30–50% faster construction compared to conventional steel erection

· Zero on-site welding — 100% bolted connections

· Lower total project cost through factory efficiency and reduced site labor

· Consistent quality — every component passes dimensional inspection before packing

· This is not a "steel kit." This is a fully engineered structure, designed to your local wind, snow, and seismic loads.

Case |520 m² Winery Fermentation & Storage Building, Niagara, Ontario

Project Location: Niagara-on-the-Lake, Ontario Building Type: Winery Fermentation and Oak Barrel Aging Facility Floor Area: 520 m² (13 m × 40 m) Eave Height: 4.0 m; Local Height 6.0 m (Fermentation Tank Zone) Lead Time: 20 days for design + 30 days for production + 25 days for land transport & erection

Project Background

The client is a boutique winery in Niagara with an annual output of approximately 30,000 bottles of wine. Its original winemaking facility is housed in a 19th‑century stone building with limited space. The new steel structure building is designed to accommodate stainless steel fermentation tanks, oak barrel storage and a tasting area. Its exterior must harmonize with the winery’s historic character.

Technical Solution

  • Portal frame structure, clear span 13 m. The ridge is locally raised to 6.0 m in the fermentation tank zone to fit 5,000 L fermentation tanks of 5 m height.
  • Exterior cladding: Cedar wood siding over the steel structure, with limestone veneer at the base to match the style of the main winery building.
  • Insulation: 100 mm PIR sandwich panels for roof, 75 mm rock wool sandwich panels for walls.
  • Fermentation zone: 200 mm reinforced concrete slab finished with acid‑resistant epoxy coating (resistant to wine acid corrosion); central drain channel at 1% slope.
  • Oak barrel aging zone: Temperature maintained steadily at 12–16 °C via passive insulation supplemented by a ground‑source heat pump.
  • Tasting area: Exposed steel structure plus full‑height glazing, presenting a striking blend of industrial aesthetics and wine culture.

Project Highlights

The hybrid steel‑wood facade integrates seamlessly into the architectural context of the Niagara wine region and secured approval from the local heritage board. Winemaker feedback: The open, spacious layout of the steel building offers far greater flexibility for fermentation tank arrangement and piping design than the old stone building.

Frequently Asked Questions

· How long does it take from order to delivery?

· Typical timeline: design & engineering 15–25 working days + fabrication 25–50 working days + ocean freight (varies by destination; e.g., 22 days to West Africa, 30 days to Europe, 35 days to East Coast North America). Most projects arrive on site within 10–14 weeks of order confirmation.

· Do you provide CE / UKCA certification?

· Yes. Our fabrication facility holds EN 1090-2 EXC3 certification (the highest execution class for steel structures). We issue a Declaration of Performance (DoP) and CE/UKCA marking for all shipments to the European Union and United Kingdom.


Canada Field Project Customized Prefabricated Steel Structure Warehouse and Integrated Office for Light Industrial Plants

Canada Field Project Customized Prefabricated Steel Structure Warehouse and Integrated Office for Light Industrial PlantsCanada Field Project Customized Prefabricated Steel Structure Warehouse and Integrated Office for Light Industrial Plants