Product Details
Place of Origin: FUJIAN,CHINA
Brand Name: QZ RIDGE
Certification: CE,SGS
Model Number: RS-11061421
Payment & Shipping Terms
Minimum Order Quantity: 250 square meters
Price: USD 55~68 square meters
Packaging Details: naked
Delivery Time: 45days
Payment Terms: L/C,T/T
Supply Ability: 20000 square meters per month
Product Name: |
Prefab Own Brand Steel Workshop |
Material: |
A36)ASTM (Q235B/Q345B)GB S355JR(EN) |
Main Frame: |
Welded H Steel Beam, Steel Truss |
Construction Drawing Design: |
SAP2000 /AutoCAD /PKPM /3D3S/TEKLA |
Performance: |
Safety, Water-proof, Sound Insulated Hear-preservation Etc. |
Product Name: |
Prefab Own Brand Steel Workshop |
Material: |
A36)ASTM (Q235B/Q345B)GB S355JR(EN) |
Main Frame: |
Welded H Steel Beam, Steel Truss |
Construction Drawing Design: |
SAP2000 /AutoCAD /PKPM /3D3S/TEKLA |
Performance: |
Safety, Water-proof, Sound Insulated Hear-preservation Etc. |
What Is a Prefabricated Steel Structure Building?
A prefabricated steel structure building is a bolt-together steel frame system in which every column, rafter, purlin, and connection plate is precision-cut, drilled, and welded in our factory — then containerized and shipped to your site for rapid assembly.
Unlike traditional on-site steel fabrication (which is slow, weather-dependent, and expensive in most countries), our approach delivers:
· 30–50% faster construction compared to conventional steel erection
· Zero on-site welding — 100% bolted connections
· Lower total project cost through factory efficiency and reduced site labor
· Consistent quality — every component passes dimensional inspection before packing
· This is not a "steel kit." This is a fully engineered structure, designed to your local wind, snow, and seismic loads.
The client is a globally leading pharmaceutical cold chain logistics enterprise. It plans to build a Latin American regional distribution hub in the Colón Free Trade Zone for transit warehousing of medicines, medical devices and vaccines. Extremely high standards are required for temperature & humidity control, cleanliness and seismic performance.
The total duration from contract signing to handover was 218 days, 22% shorter than the client’s internal baseline schedule. We set up a local 12-person installation team in Panama under the leadership of 3 Chinese supervisors, overcoming harsh construction conditions during the rainy season.
Frequently Asked Questions
· How long does it take from order to delivery?
· Typical timeline: design & engineering 15–25 working days + fabrication 25–50 working days + ocean freight (varies by destination; e.g., 22 days to West Africa, 30 days to Europe, 35 days to East Coast North America). Most projects arrive on site within 10–14 weeks of order confirmation.
· Can you handle the structural design and calculations?
· Yes. Our in-house engineering team produces a complete structural package — frame analysis, connection design, foundation reaction tables, and anchor bolt layouts — referenced to your local building code. We can also coordinate with your local engineer of record for plan review and permit submission.
![]()