Quanzhou Ridge Steel Structure Co.,Ltd.
Products
Products
Home > Products > Steel Structure Shed > China Modern Prefab Galvanized Steel Frame Light Warehouse Structure Workshop Building Factory Shed 2-Year Warranty Construction

China Modern Prefab Galvanized Steel Frame Light Warehouse Structure Workshop Building Factory Shed 2-Year Warranty Construction

Product Details

Place of Origin: FUJIAN,CHINA

Brand Name: QZ RIDGE

Certification: CE,SGS

Model Number: RS-11061421

Payment & Shipping Terms

Minimum Order Quantity: 250 square meters

Price: USD 55~68 square meters

Packaging Details: naked

Delivery Time: 45days

Payment Terms: L/C,T/T

Supply Ability: 20000 square meters per month

Get Best Price
Highlight:
Product Name:
Ware House Steel Structure
Enclosure System:
Rockwool/Fiberglass/Skylight/Light Color/Custom
Material:
Q345 Q235 H Section Steel, C/Z Section Steel
Usage:
Poultry Houses, Garage And Shed, Garage Shed
Structural Form:
Solid H-shape Steel Beam
Project Solution Capability:
Graphic Design, 3D Model Design, Total Solution For Projects
Product Name:
Ware House Steel Structure
Enclosure System:
Rockwool/Fiberglass/Skylight/Light Color/Custom
Material:
Q345 Q235 H Section Steel, C/Z Section Steel
Usage:
Poultry Houses, Garage And Shed, Garage Shed
Structural Form:
Solid H-shape Steel Beam
Project Solution Capability:
Graphic Design, 3D Model Design, Total Solution For Projects
China Modern Prefab Galvanized Steel Frame Light Warehouse Structure Workshop Building Factory Shed 2-Year Warranty Construction

What Is a Prefabricated Steel Structure Building?

A prefabricated steel structure building is a bolt-together steel frame system in which every column, rafter, purlin, and connection plate is precision-cut, drilled, and welded in our factory — then containerized and shipped to your site for rapid assembly.

Unlike traditional on-site steel fabrication (which is slow, weather-dependent, and expensive in most countries), our approach delivers:

· 30–50% faster construction compared to conventional steel erection

· Zero on-site welding — 100% bolted connections

· Lower total project cost through factory efficiency and reduced site labor

· Consistent quality — every component passes dimensional inspection before packing

· This is not a "steel kit." This is a fully engineered structure, designed to your local wind, snow, and seismic loads.

Case|General Aviation Service Centre, Johannesburg, South Africa (Hangar + Exhibition Hall), 3,600 ㎡

Project Location: Lanseria Airport, Gauteng Province, South Africa Project Type: Complex consisting of aircraft hangar, aviation material exhibition hall and office area Building Area: 3,600 ㎡ (2,400 ㎡ for hangar + 1,200 ㎡ for exhibition hall & office) Delivery Schedule: 55 days for design + 50 days for fabrication + 70 days for sea freight & erection

Project Background

The client is a South African general aviation distributor, planning to build a service centre at Lanseria Airport integrating aircraft display, maintenance & custody, and aviation material storage. The local South African steel structure codes adopt the British standard system, with special local requirements for wind load and lightning protection.

Technical Solution

  • Hangar: Large-span box steel truss, clear span of 45m × clear height of 12m, intermediate column-free
  • Steel frame + glass curtain wall + aluminium alloy roofing for exhibition hall and office section
  • 75mm rock wool sandwich panels for enclosure, colour scheme complying with the airport’s overall visual guidelines
  • Lightning strip system installed on roof, designed in accordance with SANS 62305 standard
  • Hangar floor designed for uniformly distributed live load of 5 t/㎡ (with verification for concentrated load from aircraft wheel pressure)

Project Highlights

The combination of large-area floor-to-ceiling glass and steel frame in the exhibition hall imposes extremely high requirements on installation precision. We adopted 3D laser scanning for pre-assembly at the factory stage to ensure the deviation between on-site curtain wall keels and steel structures is controlled within ±3 mm.


Customer Reviews


"The SAISC award caught us by surprise — we entered it almost as an afterthought. The judges specifically mentioned the facade integration between the steel frame and the full-height glazing. What they didn't see was the five rounds of shop drawings your team went through to get those tolerances right. Our architect initially wanted a local steel contractor because he 'didn't trust overseas fabrication'. After visiting the factory via video call and seeing the 3D laser scan pre-assembly of the first bay, he withdrew his objection. He is now specifying your company by name on his other projects."

Frequently Asked Questions

· How long does it take from order to delivery?

· Typical timeline: design & engineering 15–25 working days + fabrication 25–50 working days + ocean freight (varies by destination; e.g., 22 days to West Africa, 30 days to Europe, 35 days to East Coast North America). Most projects arrive on site within 10–14 weeks of order confirmation.

· Can you handle the structural design and calculations?

· Yes. Our in-house engineering team produces a complete structural package — frame analysis, connection design, foundation reaction tables, and anchor bolt layouts — referenced to your local building code. We can also coordinate with your local engineer of record for plan review and permit submission.

China Modern Prefab Galvanized Steel Frame Light Warehouse Structure Workshop Building Factory Shed 2-Year Warranty Construction

China Modern Prefab Galvanized Steel Frame Light Warehouse Structure Workshop Building Factory Shed 2-Year Warranty Construction